The central Planner backlog gives detection, telemetry and control gaps an intake, triage/refinement, delivery and closure lifecycle. The proposed coverage model then links a threat scenario to data requirements, detection logic and validation evidence, so each part of the coverage claim can be assessed separately.
Viewed
UK Water Utility
Make telemetry and validation dependencies visible
Give Sentinel detections a path from threat to testing
Return to the full story ←